Q-2, r. 28 - Ministerial Order concerning the fees payable under the Environment Quality Act

Full text
SCHEDULE 1
(ss. 10, 11, 12 and 13)
RATE CLASSES FOR PROJECTS SUBJECT TO THE ENVIRONMENTAL IMPACT ASSESSMENT AND REVIEW PROCEDURE PROVIDED FOR IN SUBDIVISION IV OF DIVISION II OF CHAPTER IV OF TITLE I OF THE ENVIRONMENT QUALITY ACT
  
M.O. 2008-05-07, Sch. I; M.O. 2016, s. 27; M.O. 2018-03-13, s. 5.
SCHEDULE I
(ss. 10, 11, 12 and 13)
RATE CLASSES FOR PROJECTS SUBJECT TO THE ENVIRONMENTAL IMPACT ASSESSMENT AND REVIEW PROCEDURE PROVIDED FOR IN DIVISION IV.1 OF CHAPTER I OF THE ACT
___________________________________________________________________________________

Classes of projects Subclasses of projects for Rate classes
for the application the application of the fee
________________________
of the fee schedule schedule
1 2 3 4

___________________________________________________________________________________

PROJECTS DESCRIBED IN THE
FIRST PARAGRAPH OF
SECTION 2 OF THE
REGULATION RESPECTING
ENVIRONMENTAL IMPACT
ASSESSMENT AND REVIEW
___________________________________________________________________________________

Paragraph (a)

- construction and √
subsequent operation
of a dam or dike [...]
___________________________________________________________________________________

Paragraph (b)

- program or project √
involving the dredging,
digging, filling,
levelling off or
backfilling [...]
___________________________________________________________________________________

Paragraph (c) Subclasses:

- rerouting or 1. within the same √
diverting of a river watershed - flow diverted
to the river

2. towards another watershed √
- flow not diverted to the river
___________________________________________________________________________________

Paragraph (d) Subclasses:

- construction of a port 1. construction of a port or √
or wharf wharf intended for 100 or
more pleasure or fishing craft

- extension of a port or 2. construction of any other √
wharf or modification in port or wharf
the use of a port or
wharf [...]
___________________________________________________________________________________

Paragraph (e) Subclasses:

- construction, 1. more than 1 km but less √
rebuilding or widening, than 2 km
along more than 1 km,
of a road or other 2. 2 km but less than 5 km √
public road network
designed for 4 or more
lanes of traffic [...]
3. 5 km or more √
___________________________________________________________________________________

Paragraph (f)

- construction, √
rebuilding or widening,
along more than 2 km,
of any road or other
road network intended
for forestry, mining
or energy operations
[...]
___________________________________________________________________________________

Paragraph (h)

- establishment of a √
marshalling yard or
railway station and
construction of more
than 2 km of railway
[...]
___________________________________________________________________________________

Paragraph (i)

- establishment or √
extension of an
airport [...]
___________________________________________________________________________________

Paragraph (j)

First paragraph

- construction of √
installations for
natural gas gasification
or liquefaction and
construction of more
than 2 km of oil
pipeline in a new
right-of-way [...]

Second paragraph

- construction of a gas √
pipeline more than
2 km in length
___________________________________________________________________________________

Paragraph (k) Subclasses:

- construction or 1. more than 2 km but less √
relocation of an than 5 km
electric power
transmission line of
315 kV or more over
a distance of more than
2 km 2. 5 km or more √

- construction or √
relocation of a control
or transformer station
of 315 kV or more
___________________________________________________________________________________

Paragraph (l) Subclasses:

First paragraph

- construction, √
reconstruction and
subsequent operation
of a hydroelectric
generating station
or fossil fuel-fired
generating station
with a capacity that
exceeds 5 MW

- construction, 1. 10 MW but less than √
reconstruction and 50 MW
subsequent operation of
any other electric power
generating station with
a capacity that exceeds
10 MW, except a nuclear 2. 50 MW or more √
generating station
contemplated by
subparagraph m

Second paragraph

- subject to the √
provisions of the second
paragraph of section 2,
any increase in the
capacity of a
hydroelectric generating
station [...]

Third paragraph

- addition of a √
turboalternator to a
boiler that had not been
previously used to
produce electric
power [...]
___________________________________________________________________________________

Paragraph (m)

- construction or √
extension of a nuclear
fission or fusion
establishment, of a
plant that manufactures,
processes or reprocesses
nuclear fuel, or of a
disposal or storage site
for radioactive waste
___________________________________________________________________________________

Paragraph (n)

- construction of an √
oil refinery, of a
petrochemical plant, or
of a liquid petroleum
gas fractionating plant

- construction of a plant √
that processes or
synthesizes energy-
producing gas, or of a
plant that processes or
synthesizes coal products
___________________________________________________________________________________

Paragraph (n.1) Subclasses:

- construction of a mill 1. de-inking plant √
within the meaning of the
Regulation respecting
pulp and paper mills
[...] 2. other pulp and paper mills √
___________________________________________________________________________________

Paragraph (n.2)

- construction of a √
dismembering plant
___________________________________________________________________________________

Paragraph (n.3)

- construction of a √
mill that produces
metals, metal alloys
or metalloids [...]
___________________________________________________________________________________

Paragraph (n.4)

- construction of a √
cement plant

- construction of a √
slaked lime plant
___________________________________________________________________________________

Paragraph (n.5)

- construction of an √
explosives plant
___________________________________________________________________________________

Paragraph (n.6)

- construction of a √
chemical plant [...]
___________________________________________________________________________________

Paragraph (n.7)

- construction of a √
heavy water plant
___________________________________________________________________________________

Paragraph (n.8)

- construction of an
ore processing
plant for

- metalliferous ore or √
asbestos ore, where the
processing capacity of the
plant is 2,000 metric tons
or more per day, except for
rare earths

- uranium ore √

- rare earth minerals √

- any other ore, where √
the processing capacity
of the plant is 500 metric
tons or more per day
___________________________________________________________________________________

Paragraph (n.9)

- construction of a metal √
products processing
plant [...]
___________________________________________________________________________________

Paragraph (n.10)

- construction of a mill √
that produces chipboard
from wood fibre [...]
___________________________________________________________________________________

Paragraph (n.11)

- construction of a plant √
that manufactures vehicles
or aircraft, including
parts for such vehicles
[...]
___________________________________________________________________________________

Paragraph (o)

- construction or √
extension of 1 or
more buildings in a
livestock operation [...]
___________________________________________________________________________________

Paragraph (p)

- opening and operation
of

- a metal mine or an √
asbestos mine that has
a production capacity of
2,000 metric tons or more
per day, except for rare
earths

- a uranium mine √

- a rare earth mine √

- any other mine that √
has a production
capacity of 500 metric
tons or more per day
___________________________________________________________________________________

Paragraph (q)

- program or project √
for aerial
pesticide spraying
for non-agricultural
purposes over an area
of 600 ha or more
[...]
___________________________________________________________________________________

Paragraph (r)

- construction of an √
incineration facility
governed by Chapter
III of the Regulation
respecting the
landfilling and
incineration of residual
materials (chapter Q-2, r. 19),
with a capacity
of 2 metric tons or more
per hour, an increase in
the incinerating capacity
of such a facility or an
alteration to an
incineration facility
increasing its capacity
to 2 metric tons or more
per hour
___________________________________________________________________________________

Paragraph (r.1)

- construction of an √
incinerator wholly
or partly intended for
biomedical waste
within the meaning of
section 1 of the
Regulation respecting
biomedical waste
(chapter Q-2, r. 12)
or any alteration aimed
at increasing by more
than 10% the
incinerating capacity
of such an incinerator
___________________________________________________________________________________

Paragraph (s)

- establishment of 1 √
or more reservoirs
with a total storage
capacity of over 10,000
kilolitres intended to
hold a liquid or gaseous
substance [...]
___________________________________________________________________________________

Paragraph (t)

- installation or use of √
facilities used in whole
or in part for the
incineration of residual
hazardous materials [...]
___________________________________________________________________________________

Paragraph (u)

- installation or use of √
facilities used in whole
or in part for energy
generation or pyrolysis
of residual hazardous
materials [...]
___________________________________________________________________________________

Paragraph (u.1)

- establishment or √
extension of an
engineered landfill
referred to in Division 2
of Chapter II of the
Regulation respecting
the landfilling and
incineration of residual
materials (chapter Q-2, r. 19)
used in whole or
in part for the final
deposit of household
garbage collected by or
for a municipality [...]

- establishment or √
extension of a
construction or demolition
waste landfill referred to
in the second paragraph of
section 102 of the
Regulation respecting
the landfilling and
incineration of residual
materials [...]
___________________________________________________________________________________

Paragraph (v)

- establishment or √
extension of a site
used in whole or in
part for the final
deposit of hazardous
materials [...]
___________________________________________________________________________________

Paragraph (w)

- installation or use √
of facilities used in
whole or in part for
the treatment of
residual hazardous
materials outside
their production
location [...]
___________________________________________________________________________________

Paragraph (x)

- establishment or √
extension of a site
used in whole or in
part for the final
deposit of soils
[...]
___________________________________________________________________________________

Paragraph (y)

- installation or use √
of facilities used in
whole or in part for
the heat treatment
of soils [...]
___________________________________________________________________________________
M.O. 2008-05-07, Sch. I; M.O. 2016, s. 27.
SCHEDULE I
(ss. 10, 11 and 12)
RATE CLASSES FOR PROJECTS SUBJECT TO THE ENVIRONMENTAL IMPACT ASSESSMENT AND REVIEW PROCEDURE PROVIDED FOR IN DIVISION IV.1 OF CHAPTER I OF THE ACT
___________________________________________________________________________________

Classes of projects Subclasses of projects for Rate classes
for the application the application of the fee
________________________
of the fee schedule schedule
1 2 3 4

___________________________________________________________________________________

PROJECTS DESCRIBED IN THE
FIRST PARAGRAPH OF
SECTION 2 OF THE
REGULATION RESPECTING
ENVIRONMENTAL IMPACT
ASSESSMENT AND REVIEW
___________________________________________________________________________________

Paragraph (a)

- construction and √
subsequent operation
of a dam or dike [...]
___________________________________________________________________________________

Paragraph (b)

- program or project √
involving the dredging,
digging, filling,
levelling off or
backfilling [...]
___________________________________________________________________________________

Paragraph (c) Subclasses:

- rerouting or 1. within the same √
diverting of a river watershed - flow diverted
to the river

2. towards another watershed √
- flow not diverted to the river
___________________________________________________________________________________

Paragraph (d) Subclasses:

- construction of a port 1. construction of a port or √
or wharf wharf intended for 100 or
more pleasure or fishing craft

- extension of a port or 2. construction of any other √
wharf or modification in port or wharf
the use of a port or
wharf [...]
___________________________________________________________________________________

Paragraph (e) Subclasses:

- construction, 1. more than 1 km but less √
rebuilding or widening, than 2 km
along more than 1 km,
of a road or other 2. 2 km but less than 5 km √
public road network
designed for 4 or more
lanes of traffic [...]
3. 5 km or more √
___________________________________________________________________________________

Paragraph (f)

- construction, √
rebuilding or widening,
along more than 2 km,
of any road or other
road network intended
for forestry, mining
or energy operations
[...]
___________________________________________________________________________________

Paragraph (h)

- establishment of a √
marshalling yard or
railway station and
construction of more
than 2 km of railway
[...]
___________________________________________________________________________________

Paragraph (i)

- establishment or √
extension of an
airport [...]
___________________________________________________________________________________

Paragraph (j)

First paragraph

- construction of √
installations for
natural gas gasification
or liquefaction and
construction of more
than 2 km of oil
pipeline in a new
right-of-way [...]

Second paragraph

- construction of a gas √
pipeline more than
2 km in length
___________________________________________________________________________________

Paragraph (k) Subclasses:

- construction or 1. more than 2 km but less √
relocation of an than 5 km
electric power
transmission line of
315 kV or more over
a distance of more than
2 km 2. 5 km or more √

- construction or √
relocation of a control
or transformer station
of 315 kV or more
___________________________________________________________________________________

Paragraph (l) Subclasses:

First paragraph

- construction, √
reconstruction and
subsequent operation
of a hydroelectric
generating station
or fossil fuel-fired
generating station
with a capacity that
exceeds 5 MW

- construction, 1. 10 MW but less than √
reconstruction and 50 MW
subsequent operation of
any other electric power
generating station with
a capacity that exceeds
10 MW, except a nuclear 2. 50 MW or more √
generating station
contemplated by
subparagraph m

Second paragraph

- subject to the √
provisions of the second
paragraph of section 2,
any increase in the
capacity of a
hydroelectric generating
station [...]

Third paragraph

- addition of a √
turboalternator to a
boiler that had not been
previously used to
produce electric
power [...]
___________________________________________________________________________________

Paragraph (m)

- construction or √
extension of a nuclear
fission or fusion
establishment, of a
plant that manufactures,
processes or reprocesses
nuclear fuel, or of a
disposal or storage site
for radioactive waste
___________________________________________________________________________________

Paragraph (n)

- construction of an √
oil refinery, of a
petrochemical plant, or
of a liquid petroleum
gas fractionating plant

- construction of a plant √
that processes or
synthesizes energy-
producing gas, or of a
plant that processes or
synthesizes coal products
___________________________________________________________________________________

Paragraph (n.1) Subclasses:

- construction of a mill 1. de-inking plant √
within the meaning of the
Regulation respecting
pulp and paper mills
[...] 2. other pulp and paper mills √
___________________________________________________________________________________

Paragraph (n.2)

- construction of a √
dismembering plant
___________________________________________________________________________________

Paragraph (n.3)

- construction of a √
mill that produces
metals, metal alloys
or metalloids [...]
___________________________________________________________________________________

Paragraph (n.4)

- construction of a √
cement plant

- construction of a √
slaked lime plant
___________________________________________________________________________________

Paragraph (n.5)

- construction of an √
explosives plant
___________________________________________________________________________________

Paragraph (n.6)

- construction of a √
chemical plant [...]
___________________________________________________________________________________

Paragraph (n.7)

- construction of a √
heavy water plant
___________________________________________________________________________________

Paragraph (n.8)

- construction of an
ore processing
plant for

- metalliferous ore or √
asbestos ore, where the
processing capacity of the
plant is 7,000 metric tons
or more per day

- uranium ore √

- any other ore, where √
the processing capacity
of the plant is 500 metric
tons or more per day
___________________________________________________________________________________

Paragraph (n.9)

- construction of a metal √
products processing
plant [...]
___________________________________________________________________________________

Paragraph (n.10)

- construction of a mill √
that produces chipboard
from wood fibre [...]
___________________________________________________________________________________

Paragraph (n.11)

- construction of a plant √
that manufactures vehicles
or aircraft, including
parts for such vehicles
[...]
___________________________________________________________________________________

Paragraph (o)

- construction or √
extension of 1 or
more buildings in a
livestock operation [...]
___________________________________________________________________________________

Paragraph (p)

- opening and operation
of

- a metals mine or an √
asbestos mine that has
a production capacity of
7,000 metric tons or more
per day

- a uranium mine √

- any other mine that √
has a production
capacity of 500 metric
tons or more per day
___________________________________________________________________________________

Paragraph (q)

- program or project √
for aerial
pesticide spraying
for non-agricultural
purposes over an area
of 600 ha or more
[...]
___________________________________________________________________________________

Paragraph (r)

- construction of an √
incineration facility
governed by Chapter
III of the Regulation
respecting the
landfilling and
incineration of residual
materials (chapter Q-2, r. 19),
with a capacity
of 2 metric tons or more
per hour, an increase in
the incinerating capacity
of such a facility or an
alteration to an
incineration facility
increasing its capacity
to 2 metric tons or more
per hour
___________________________________________________________________________________

Paragraph (r.1)

- construction of an √
incinerator wholly
or partly intended for
biomedical waste
within the meaning of
section 1 of the
Regulation respecting
biomedical waste
(chapter Q-2, r. 12)
or any alteration aimed
at increasing by more
than 10% the
incinerating capacity
of such an incinerator
___________________________________________________________________________________

Paragraph (s)

- establishment of 1 √
or more reservoirs
with a total storage
capacity of over 10,000
kilolitres intended to
hold a liquid or gaseous
substance [...]
___________________________________________________________________________________

Paragraph (t)

- installation or use of √
facilities used in whole
or in part for the
incineration of residual
hazardous materials [...]
___________________________________________________________________________________

Paragraph (u)

- installation or use of √
facilities used in whole
or in part for energy
generation or pyrolysis
of residual hazardous
materials [...]
___________________________________________________________________________________

Paragraph (u.1)

- establishment or √
extension of an
engineered landfill
referred to in Division 2
of Chapter II of the
Regulation respecting
the landfilling and
incineration of residual
materials (chapter Q-2, r. 19)
used in whole or
in part for the final
deposit of household
garbage collected by or
for a municipality [...]

- establishment or √
extension of a
construction or demolition
waste landfill referred to
in the second paragraph of
section 102 of the
Regulation respecting
the landfilling and
incineration of residual
materials [...]
___________________________________________________________________________________

Paragraph (v)

- establishment or √
extension of a site
used in whole or in
part for the final
deposit of hazardous
materials [...]
___________________________________________________________________________________

Paragraph (w)

- installation or use √
of facilities used in
whole or in part for
the treatment of
residual hazardous
materials outside
their production
location [...]
___________________________________________________________________________________

Paragraph (x)

- establishment or √
extension of a site
used in whole or in
part for the final
deposit of soils
[...]
___________________________________________________________________________________

Paragraph (y)

- installation or use √
of facilities used in
whole or in part for
the heat treatment
of soils [...]
___________________________________________________________________________________
M.O. 2008-05-07, Sch. I.